Industrial photovoltaic self-consumption

Table of Contents

Why industrial self-consumption works

  • High overlap with production: many processes consume during daylight hours.

  • Expensive peaks: with battery and management we do peak-shaving to lower power in P1-P2.

  • Stable cost: your PV LCOE goes down and you de-index part of the energy cost.

  • Underutilized assets: roof or land = own energy and ESG image.

Modalities and when to choose each one

Modality When it fits Practical note
No surplus (no overflow) contract or network that does not support injection fast-track procedures; avoid over-sizing
With surplus (compensation) LV ≤ ~100 kW and daytime consumption monetizes surplus; adjusts size
Sale of energy >100 kW or HV market representation
With batteries expensive peaks on P1-P2; evening/night consumption increase % useful and low contracted power

PPA vs EPC (financing)

  • PPAon-site (without investment): you pay per kWh cheaper than grid, 7-15 year contract; O&M included; purchase option.
  • EPC (turnkey): own investment; typical amortization [fill in]-[fill in] years; maximum control of the asset.

At fotovol, we compare NPV/IRR in both scenarios and propose the one that leaves the least € on the table.

How much it costs and how much you save

type of industry typical power % self-consumption without / with battery
light ship / logistics 80-200 kWp 45-65% / 65-85%
industrial cooling 100-400 kWp 40-65% / 65-90%
manufacturing with peaks (compressors, furnaces) 150-500 kWp 35-60% / 60-85%

Example 1 – industry 300 kWp + ESS

  • Consumption: 1,200 MWh/year – PV 300 kWp → production ≈ 480 MWh/year.
  • Battery 250 kW / 500 kWh → peak-shaving 150 kW in P1-P2.
  • Energy savings (55% auto): ~42-50 k€ /year
  • Power savings: ~8-15 k€ /year
  • Estimated total: ~50-65 k€ /year (with O&M and degradation modeled in NPV)

Example 2 – logistics 150 kWp without ESS

  • Consumption: 450 MWh/year – production ≈ 240 MWh/year
  • Self-consumption 60% + compensation 10% → ~22-28 k€ /year (depending on price and periods).

Industrial batteries? When yes

  • REBT / ITC-BT-40: DC/AC protections, anti-islanding, SPD, selectivity, earths.
  • OCA: initial and every 5 years when applicable (LV by power/use; HV always).
  • Access and connection: metering points, compensation or sales contract, anti-pouring if applicable.
  • Urban planning and structure: calculation, lifelines, handrails, civil works if canopies/terrain.

Industrial O&M

  • 24/7 monitoring with alerts and KPIs: PR, % self-consumption, cut-off power.
  • Programmed cleaning according to actual soiling, tightening and thermography.
  • Response SLA and critical spare parts.
  • Monthly reports with savings by periods and recommendations for improvement.

Grants and financing

  • Municipal subsidies (ibi/icio) and regional programs.

  • On-site PPA: no initial investment; you pay per kWh cheaper than the grid.

  • Turnkey EPC if you prefer to be owners from day 1.

  • We combine subsidies and deductions to maximize ROI.

Our projects

Vidresif reduce su consumo anual
Vidresif
Location: Porqueres
Power: 665 kWp
Huerta Solar el Figueral
El Figueral solar farm
Location: Capmany
Power: 600 kWp
Projecte executat a l'empresa Royal Protein, format per 308 panells fotovoltaics amb una potència de 140 kWp.
Royal Protein
Location: Porqueres
Power: 140 kWp
La Granja Bahi situada al municipi de La Pera, ha confiat en Fotovol per dur a terme un sistema fotovoltaic amb una potència de 91 kWp.
Bahí Farm
Location: La Pera
Power: 91 kWp
Fernandez Carpinteros ha confiado en Fotovol para llevar a cabo una instalación por autoconsumo con una potencia de 46 kWp.
Fernandez Fusters, S.L.
Location: La Bisbal d'Empordà
Power: 46 kWp
Projecte en funcionament a Sant Miquel de Campmajor, consistent en una instal·lació fotovoltaica per autoconsum amb una potència de 12 kWp.
Sant Miquel de Campmajor Guesthouse
Location: Sant Miquel de Campmajor
Power: 12 kWp

Frequently Asked Questions

We propose it when it provides profitable peak-shaving or increases a lot the useful % in evening/night shifts. The decision is based on your load curve and period pricing.

Up to 100 kW in LV, simplified compensation is usually applied. Above and/or in HV, it is usually sale with representative. Even so, we size for self-consumption first.

From 3 to 10 weeks of work depending on size and civil works; legalization and, if applicable, OCA, go in parallel. We give you a schedule with milestones.

Yes, with battery and management peaks are cut in P1-P2. We adjust power by periods and quantify the savings in €/kW-year.

We value the installation of canopies or solar gardens with fencing and CCTV. We also reinforce structure if necessary.