Photovoltaic panels for businesses in Girona

Reduce your electricity cost and stabilize your OPEX with a PV plant from 30-200 kW. Technical and financial study, average ROI 3-5 years, ICAEN processing and surplus compensation.

In today’s economic environment, electricity cannot be treated as an uncontrollable variable cost. An industrial photovoltaic plant is a high-yield financial asset that structurally reduces the cost per kWh.

At Fotovol we specialize in industrial solar engineering for companies in the province of Girona, developing projects from 30 kW to more than 500 kW, custom-designed to improve operating margin (EBITDA) and provide real protection against the volatility of the electricity pool.

Specialization by industrial sectors in the province

Agri-food and Meat Sector

We design high-power systems to meet the critical and constant daytime energy demand in cold storage facilities and processing plants (very common in areas such as Gironès and Garrotxa), achieving immediate savings of between 40% and 70% in energy costs.

Industrial Buildings and Logistics Centers

We carry out installations under the Low Voltage Electrotechnical Regulation (REBT), with advanced SCADA monitoring systems by string and industrial grade protections prepared for demanding environments.

Tourism and Hospitality Sector

We design solar plants for large areas and hotel complexes on the Costa Brava, absorbing the peak seasonal consumption in summer and increasing the value of the real estate asset.

Detailed engineering: Quarter-hour analysis and roof preservation

Unlike commercial budgets based on adapted residential roofs, an industrial project requires analytical rigor and construction safety:

Load Curve Study

We analyze the fiscal meter's historical data in 15-minute intervals (quarter-hourly curve) across tariff periods (P1 to P6). This allows us to precisely size the plant, avoid grid feed-in surcharges, and design peak shaving strategies.

Integrated Structural Calculation

The roof is a critical element of your building. Before installing a single panel, we calculate the static and dynamic loads according to the Spanish Building Code (CTE), ensuring that the fixings to sandwich panels, corrugated metal sheets, or flat roofs maintain waterproofing and withstand local mechanical stresses.

Financial viability, ROI and investment modalities

A well-designed project in Girona has a real payback period of between 3 and 5 years, paving the way for more than two decades of electricity at virtually zero cost (useful life of industrial components exceeding 30 years).

We analyze the most efficient access method for your finance department:

  • CAPEX (Own Investment): Maximum long-term economic return, with the right to accelerated depreciation in Corporate Income Tax for investments in renewable energy.
  • PPA (Power Purchase Agreement): Project execution without initial investment. The company only pays for the energy consumed at a fixed, agreed price, much lower than that of the commercial grid, preserving cash flow.

Comprehensive incentive management before the ICAEN

We don’t burden your team with bureaucracy. We handle all the technical paperwork with the ICAEN (Catalan Energy Institute), manage the Energy Saving Certificates (CAE), and provide the documentation required by the local councils to apply for the corresponding IAE, IBI, and ICIO tax breaks in your municipality.

How we work

Initial study (5 days)

We analyze your hourly consumption, contracted power and available surface area. Our team prepares a technical report with production simulation, savings and return on investment.

Customized technical proposal

We present you a detailed project with electrical dimensioning, execution plan and economic report, complying with RD 244/2019 and REBT. Includes 3D modeling of the roof and estimation of annual performance according to climatic data of Girona.

Certified installation

We assemble with approved industrial equipment and oversized wiring for maximum durability. The process is normally completed in 3 - 10 days, depending on the power.

Legalization and compensation of surpluses

We take care of all the procedures before the Generalitat de Catalunya, Endesa Distribución, Iberdrola Empresas or Naturgy, to register your installation in the self-consumption registry and activate the compensation of surpluses or zero discharge.

Monitoring and maintenance

With our remote control platform you will be able to follow production, consumption and system status in real time. Includes annual revisions, cleaning, checking of strings and protections, and priority support with 24 h response times in the province of Girona.

As a company associated with UNEF, and the Gremi d’Instal-ladors de Girona, we guarantee that our installations meet the highest standards of the solar sector in Spain.

Real-life examples of solar installations in Girona

Having real-world examples helps to understand the impact an industrial photovoltaic installation can have in Girona. Below, we showcase some projects developed for companies in various sectors within the province. Each commercial solar system is custom-designed according to the company’s consumption profile, activity, and available space.

Projecte en funcionament a Sant Miquel de Campmajor, consistent en una instal·lació fotovoltaica per autoconsum amb una potència de 12 kWp.
Location: Sant Miquel de Campmajor, Girona
Power: 12 kWp
Fernandez Carpinteros ha confiado en Fotovol para llevar a cabo una instalación por autoconsumo con una potencia de 46 kWp.
Location: La Bisbal d'Empordà
Power: 46 kWp
La Granja Bahi situada al municipi de La Pera, ha confiat en Fotovol per dur a terme un sistema fotovoltaic amb una potència de 91 kWp.
Location: La Pera, Girona
Power: 91 kWp
Projecte executat a l'empresa Royal Protein, format per 308 panells fotovoltaics amb una potència de 140 kWp.
Location: Porqueres, Girona
Power: 140 kWp
Huerta Solar el Figueral
Location: Capmany
Power: 600 kWp
Vidresif reduce su consumo anual
Location: Porqueres, Girona
Power: 665 kWp

Do you want to assess the generation potential of your industrial roof?

Contact our technical office in Girona and request a preliminary 5-day energy audit based on your actual consumption pattern.

Contact me by calling or writing to

What our customers say

Estamos muy contentos con la instalación de su casa, con todos los trámites y todo el proceso.
¡Los operarios muy profesionales, limpios y pulidos, se nota que saben lo que se hacen!
Buenor 98 profile picture
Buenor 98
2 years ago
Hace un par de meses vinieron a instalar un punto de carga por coche en casa, y realizaron un trabajo impecable.
Además, prepararon los papeles y me guiaron en todo momento para realizar la solicitud de la subvención del Plan Moves III.
alex masgrau profile picture
alex masgrau
3 years ago
Muy recomendable, buen trabajo y eficiente, en pocos días teníamos todas las placas montadas.
¡Buena gestión administrativa para todos los trámites de legalización!
Luis Ballesteros profile picture
Luis Ballesteros
3 years ago
Muy profesionales siempre dispuestos a encontrar soluciones. Instalación rápida y efectiva. Nos han ayudado mucho, tanto en la tramitación de toda la documentación como en el sistema de monitoreo. Les recomiendo.
Martina Hassler profile picture
Martina Hassler
3 years ago
Muy recomendable. Estamos muy contentos con la calidad de la instalación y la atención de servicio posventa. Muchas gracias por todo.
Ernesto Maier profile picture
Ernesto Maier
3 years ago
Súper profesionales.
Hemos puesto placas solares con el equipo de Fotvol y francamente nos trataron super bien con explicaciones super claras y el montaje fue genial, estamos super contentos. El equipo de gente que tienen es una pasada y repetiriamos sin ningun tipo de duda.

We are close to you

Only 40 km away from Girona, Fotovol guarantees quick trips for installations, technical visits and maintenance.

Schedule

Mon -Thurs: 9:00-18:00
Fri: 9:00-15:00

Going by car

41°57'14.5 "N 3°03'58.2 "E

Frequently asked questions about industrial self-consumption in Girona

The price depends on the size of the installation and the company’s consumption. As a reference, an average industrial installation of 50 kWp is around €45,000, including engineering, materials, installation and legalization. From there, savings can exceed €15,000 per year, with an estimated payback of 3 to 5 years.

The projects are governed by Royal Decree 244/2019, which regulates the modalities of self-consumption, and by the REBT (Low Voltage Electrotechnical Regulation).

In Catalonia, in addition, the guidelines of the ICAEN (Institut Català d’Energia) and municipal ordinances on licenses and local taxes such as ICIO are applied.

Yes, if you choose the self-consumption mode with compensated surpluses, you will be able to feed the energy not consumed into the grid and obtain a monthly financial compensation in your electricity bill.

At FOTOVOL we manage the entire process with your distribution company (Endesa Distribución, Iberdrola Empresas or Naturgy), ensuring that the process is legalized correctly.

In Girona, thanks to its excellent solar radiation (more than 3,000 hours/year), the return on investment (ROI) is between 3 and 5 years, depending on the consumption pattern.

From that moment on, the savings are pure profit, with a useful life of more than 25 years for the solar panels and production guarantees of more than 80% in the long term.

No. The installation is done without stopping the activity and at times compatible with your operation.
Our technicians plan the work to minimize any interference and ensure the electrical and structural safety of the roof.

Maintenance is minimal but key to ensuring performance:

  • Cleaning of modules 1-2 times a year.
  • Review of connections, inverters and protections.
  • Continuous remote monitoring (automatic alerts).

FOTOVOL offers preventive and corrective maintenance of solar panels, with response times of 24 h in the province of Girona.

Approximately 6 to 8 m² are required for each kWp installed. For example, a 50 kWp installation requires between 300 and 400 m² of free roof, although the design is adjusted to the type of roof (sandwich panel, fiber cement, pitched structure, etc.).

We take care of the whole process:

  • Technical report or approved project.
  • Building permit or prior communication at the city hall.
  • Legalization before the ICAEN and the electricity distribution company.
  • Registration in the registry of self-consumption of the Generalitat de Catalunya.
  • Management of IAE / ICIO bonuses and Next Generation subsidies.